Match the surface, structure, and maintenance plan.
Start with material, profile, color, fastening system, exposure, and total deck area before narrowing the exact product.
Decking

Trex®
Available to order. Call to confirm current quantities and lead time. Used for outdoor decking and exterior living projects. Trex composite decking for outdoor living projects. Current lead time is about 1–2 days; call to confirm.
16’ – 20’ (square); 12’ – 20’ (grooved)

TimberTech®
Available to order. Call to confirm current quantities and lead time. Used for outdoor decking and exterior living projects. TimberTech composite decking for outdoor living projects. Current lead time is about 1–2 days; call to confirm.
16’ – 20’ (square); 12’ – 20’ (grooved)

Fiberon®
Made to order based on project specifications. Used for outdoor decking and exterior living projects. Fiberon composite decking for outdoor living projects. Project orders typically require about 1–2 weeks.
16’ – 20’ (square); 12’ – 20’ (grooved)

Sylvanix®
Available to order. Call to confirm current quantities and lead time. Used for outdoor decking and exterior living projects. Syvlanix composite decking for outdoor living projects. Current lead time is about 3–5 days; call to confirm.
12’ – 20’ (grooved); 16’ – 20’ (square)

5/4 x 6 Cedar Decking
Good One Side (C1S) / Good Two Sides (C2S)
This item is available to order; call to confirm current timing. Commonly used for deck boards, stairs, framing, and outdoor construction. Cedar decking offers a natural look for outdoor living surfaces. Current lead time is about 1–5 days; call to confirm.
12' | 16' in both grades

Thermory®
Made to order based on project specifications. Used for outdoor decking and exterior living projects. Thermally modified hardwood decking from the Thermory product line. Project orders typically require about 1–2 weeks.
Random lengths
SPECIFICATION HELP
01 / APPLICATION
Where it will be installed, what it supports, and how it will be exposed narrow the right product.
02 / SPECIFICATION
Nominal size, actual dimensions, grade, treatment, span, and code requirements should match the plan.
03 / LOGISTICS
Quantity, lead time, pickup, delivery access, and job sequence determine how the order should be staged.
